KAFD Ryjadh for Lindner Facades

My scope was

  • the technical risk anlysis of the design, material and Installation Methode.
  • to develop a chart for re-organisation
  • to investigate the true Project status
  • per Review of the design
      
building 5.05
building 5.05
building 2.12
building 2.12